Shop · 10 items

Printable Digital Downloads

Ten printable worksheet sets you download, print and fill in by hand.

Which one to choose — tap a kit name to open it. The page count is what one file contains; the second file is the same pages in the other paper size, not extra sheets.

  • Desk Reset Kit — $5.00 · 6 pages — for clearing and re-setting your own workspace: a four-step reset to begin, mapping your workspace, a daily reset, a week of small resets, giving everyday items a home, and keeping what works.
  • Pet Sitter Handoff & Routine Organizer — $5.00 · 6 pages — for writing down one pet-sitting stay: pet profile, contacts and instructions, routine and feeding notes, a daily care log the sitter fills in, where supplies are kept, and a visit checklist with handback.
  • Vehicle Care Log — $5.00 · 6 pages — for keeping your own vehicle records on paper: a vehicle overview, service history, upcoming-service notes you copy from your own manual, a fuel or energy log, tire and service notes, and an annual summary with a document index.
  • Home Inventory and Warranty Organizer — $5.00 · 6 pages — for keeping track of what you own, one room at a time: a quick start and room index, a room-by-room item register, a detail sheet for anything valuable, a warranty record you copy from the supplier's own document, a maintenance and service log, and a document locator with a yearly review checklist.
  • Home Project Planner and Quote Comparison — $5.00 · 6 pages — for a home project you are organising yourself: a project brief, three quotes side by side in the words each one uses, materials and selections, a task and decision log, spending and receipts, and open items with closeout notes.
  • Move-In Organizer — $5.00 · 6 pages — for moving house: a countdown from four weeks out to moving day, a room and box index you number as you seal each box, a first-night essentials checklist, a room-by-room setup planner, first-week tasks, and a 30-day follow-through.
  • Home Cleaning Routine Planner — $5.00 · 6 pages — for running the cleaning in a shared home: a weekly schedule with the jobs, who is doing them and the time set aside, a room task rotation with a skip-until date, a monthly deep-clean schedule across a year, a supply inventory and reorder list, a who-does-what page for the household, and a done-and-reviewed log.
  • Travel Packing and Outfit Planner — $5.00 · 4 pages — for one trip: a trip overview with the bags you are taking, a categorised packing checklist, outfits planned by day and occasion, and two short passes of checks — before you leave, and when you get home.
  • Weekly Meal and Grocery Planner — $5.00 · 4 pages — for deciding what to eat this week: a weekly meal plan, a pantry and freezer inventory, a grocery list grouped by aisle, and a favorites and next-week page. No recipes and no dietary guidance — the pages hold your own plans.
  • Client Workflow Starter Kit — $9.00 · 6 pages — for running one client job on paper, from intake through to follow-up, on six sheets.

Each set comes as two static PDF files — one sized for US Letter and one for A4, holding the same pages — so you print whichever matches your paper. They are writing sheets, not fillable on-screen forms.

Digital download only. Nothing physical is shipped, and download access is delivered by email after payment. A printer and paper are needed for printed use and are not included.

Skip to results list

Active filters:

10 items
Column grid
Column grid

Filter

Active filters: